BMPT Terminator vs Namer
| Russian combat support vehicle, entered service in 2011, designed to protect tanks and infantry in urban environments. | |
| Origin country | 🇷🇺 Russia |
| Category | Light Armoured Vehicle |
| Type | Heavy Armored Combat Support Vehicle |
| Manufacturer | Uralvagonzavod |
| Number produced | 33 units |
| Estimated unit price | $-- million |
| Israeli APC, entered service in 2008, based on the Merkava tank chassis. | |
| Origin country | 🇮🇱 Israel |
| Category | Armored Personnel Carrier |
| Type | Heavy armoured personnel carrier |
| Manufacturer | IDF Ordnance |
| Number produced | 290 units |
| Estimated unit price | $5 million |
| Combat weight | 48.0 tons â—‰ |
| Maximum speed | 60 km/h â—‰ |
| Operational range | 550 km â—‰ |
| Length | 7.20 m |
| Width | 3.60 m |
| Height | 3.33 m |
| Crew | 5 |
| Engine | Diesel Engine with 1000 hp |
| Main armament | 4× 130 mm Ataka-T GWS launchers |
| Secondary weapon | 2× 30 mm 2A42 autocannons (850 rounds) |
| Combat weight | 60.0 tons â—‰ |
| Maximum speed | 85 km/h â—‰ |
| Operational range | 500 km â—‰ |
| Length | -- m |
| Width | -- m |
| Height | -- m |
| Crew | 3 (commander, driver, RCWS operator) + 9 troops |
| Engine | 1,200 hp (895 kW) turbocharged diesel engine |
| Main armament | Samson RCWS equipped with either 12.7 mm (0.50 in) M2 machine gun or Mk 19 grenade launcher |
| Secondary weapon | 1 × 7.62 mm (0.300 in) FN MAG MG |
Performance Radar Chart
Frequently Asked Questions
Which is faster, the BMPT Terminator or Namer?
The Namer is faster with a maximum road speed of 85 km/h compared to the BMPT Terminator's 60 km/h.
Which has longer operational range, the BMPT Terminator or Namer?
The BMPT Terminator has a longer operational range at 550 km compared to the Namer's 500 km.
Which is heavier, the BMPT Terminator or Namer?
The Namer is heavier at 60.0 tons combat weight compared to the BMPT Terminator's 48.0 tons.
Which is larger, the BMPT Terminator or Namer?
The BMPT Terminator is longer at 7.20 meters compared to the Namer's 0.00 meters.
How many crew members do the BMPT Terminator and Namer require?
The BMPT Terminator requires a larger crew of 5 compared to the Namer's 3 (commander, driver, RCWS operator) + 9 troops crew members.
Which has been built in greater numbers, the BMPT Terminator or Namer?
The Namer has been produced in greater numbers with 290 units compared to 33 units of the BMPT Terminator.
What are the main armaments of the BMPT Terminator and Namer?
The BMPT Terminator is armed with 4× 130 mm Ataka-T GWS launchers while the Namer carries Samson RCWS equipped with either 12.7 mm (0.50 in) M2 machine gun or Mk 19 grenade launcher as its main armament.