C-130 Hercules vs C-1

American military transport aircraft, known for significant roles in Vietnam War and Desert Storm, extensively used for various cargo missions.
Picture of C-130 Hercules
Origin country 🇺🇸 United States
Category Military Transport Aircraft
Manufacturer Lockheed
First flight 23 August 1954
Year introduced 1956
Number produced 2500 units
Average unit price $68 million

C-1

Japanese transport aircraft, notable for its use in the Self-Defense Forces during the Cold War era.
Picture of C-1
Origin country 🇯🇵 Japan
Category Military Transport Aircraft
Manufacturer Kawasaki
First flight 12 November 1970
Year introduced 1974
Number produced 31 units
Average unit price $50 million
Wing area 162.0 m² ◉
Wingspan 40.4 m â—‰
Height 11.7 m â—‰
Length 29.8 m â—‰
Maximum speed 593 km/h â—‰
Operational range 3,800 km â—‰
Service ceiling 10,058 m â—‰
Max. takeoff weight 70,307 kg â—‰
Empty weight 35,800 kg â—‰
Total thrust 4 x 3,661 kW â—‰
Profile drawing of Lockheed C-130 Hercules

C-1

Wing area 120.5 m² ◉
Wingspan 30.3 m â—‰
Height 10.0 m â—‰
Length 29.0 m â—‰
Maximum speed 806 km/h â—‰
Operational range 3,353 km â—‰
Service ceiling 11,580 m â—‰
Max. takeoff weight 45,000 kg â—‰
Empty weight 24,300 kg â—‰
Total thrust 2 x 6,574 kgf â—‰
Profile drawing of Kawasaki C-1

Performance Radar Chart

Frequently Asked Questions

Which is faster, the C-130 Hercules or C-1?
The C-1 is faster with a maximum speed of 806 km/h compared to the C-130 Hercules's 593 km/h, a difference of 213 km/h.
Which has longer range, the C-130 Hercules or C-1?
The C-130 Hercules has a longer range at 3,800 km compared to the C-1's 3,353 km.
Which can fly higher, the C-130 Hercules or C-1?
The C-1 has a higher service ceiling at 11,580 meters (37,992 ft) compared to the C-130 Hercules's 10,058 meters (32,998 ft).
Which is heavier, the C-130 Hercules or C-1?
The C-130 Hercules has a higher maximum takeoff weight at 70,307 kg compared to the C-1's 45,000 kg.
Which is larger, the C-130 Hercules or C-1?
The C-130 Hercules is longer at 29.8 meters compared to the C-1's 29.0 meters.
Which is more expensive, the C-130 Hercules or C-1?
The C-130 Hercules is more expensive at approximately $68 million per unit compared to the C-1 at $50 million.
Which entered service first, the C-130 Hercules or C-1?
The C-130 Hercules entered service first in 1956, 18 years before the C-1 which entered service in 1974.
Which has been built in greater numbers, the C-130 Hercules or C-1?
The C-130 Hercules has been produced in greater numbers with 2,500 units compared to 31 units of the C-1.