Rapier vs S-500 Prometheus

The Rapier and the S-500 Prometheus are both Surface-to-Air missiles. The S-500 Prometheus has a range of 600 km — 73:1 the Rapier's 8 km. The Rapier reaches 3,700 km/h vs 25,200 km/h for the S-500 Prometheus. The Rapier entered service 50 years before the S-500 Prometheus (1971 vs 2021).

British surface-to-air missile, entered service in 1971, utilizes semi-automatic command to line of sight guidance.
Origin 🇬🇧 United Kingdom
Category Surface-to-Air
Type Radar-guided surface-to-air missile
Manufacturer British Aerospace
Service year 1971
Number produced 25,000 units
Estimated unit price NA
Russian surface-to-air missile, entered service in 2021, with a maximum speed of Mach 20.6.
Origin 🇷🇺 Russia
Category Surface-to-Air
Type Surface-to-air missile / anti-ballistic missile
Manufacturer Almaz-Antey
Service year 2021
Number produced -- units
Estimated unit price $2500 million
Range 8.2 km
Maximum speed Mach 3.0
Weight 43 kg
Warhead 1.0 kg
Length 2.24 m
Diameter 133 mm
Guidance Semi-automatic command to line of sight
Warhead type High Explosive
Range 600.0 km
Maximum speed Mach 20.6
Weight -- kg
Warhead -- kg
Length NA
Diameter -- mm
Guidance --
Warhead type --

Performance Radar Chart

Frequently Asked Questions

Which has longer range, the Rapier or S-500 Prometheus?
The S-500 Prometheus has a longer range at 600 km compared to the Rapier's 8 km.
Which is faster, the Rapier or S-500 Prometheus?
The S-500 Prometheus is faster with a maximum speed of Mach 20.6 compared to the Rapier's Mach 3.0.
Which has a larger warhead, the Rapier or S-500 Prometheus?
The Rapier carries a larger warhead at 1 kg compared to the S-500 Prometheus's 0 kg.
Which is heavier, the Rapier or S-500 Prometheus?
The Rapier is heavier at 43 kg compared to the S-500 Prometheus's 0 kg.
Which is longer, the Rapier or S-500 Prometheus?
The Rapier is longer at 2.24 meters compared to the S-500 Prometheus's 0.00 meters.
Which entered service first, the Rapier or S-500 Prometheus?
The Rapier entered service first in 1971, 50 years before the S-500 Prometheus which entered service in 2021.