Doha vs Project 1241.1 Molnaya
The Doha and the Project 1241.1 Molnaya are both Corvette classes. The Doha displaces 3,300 tons — 6.0x the Project 1241.1 Molnaya's 549 tons. The Doha reaches 28 knots vs 42 knots for the Project 1241.1 Molnaya. The Doha carries a crew of 98 vs 50 for the Project 1241.1 Molnaya. The Doha was produced in 4 units vs 80 for the Project 1241.1 Molnaya. The Doha was commissioned in 2021, 44 years after the Project 1241.1 Molnaya (1977).
| Italian corvette, 3,300 tons displacement, uses combined diesel and diesel CODAD propulsion. | |
| Origin | 🇮🇹 Italy |
| Category | Corvette |
| Type | Corvette |
| Manufacturer | Fincantieri |
| Year introduced | 2021 |
| Number built | 4 units |
| Estimated unit price | NA |
| Displacement | 3,300 tons ◉ |
| Maximum speed | 28.0 knots ◉ |
| Range | NA |
| Length | 107.0 m ◉ |
| Beam | 14.7 m ◉ |
| Crew | 98 ◉ |
| Propulsion | Combined diesel and diesel CODAD 4 Everllence 16V28/33D STC |
| Armament |
|
| Displacement | 549 tons ◉ |
| Maximum speed | 42.0 knots ◉ |
| Range | 2,400 nm at 12 knots |
| Length | 56.0 m ◉ |
| Beam | 10.5 m ◉ |
| Crew | 50 ◉ |
| Propulsion | 2 shaft COGAG turbines at 11,000 hp each, plus 2 cruising engines at 4,000 hp each |
| Armament |
|
Performance Radar Chart
Frequently Asked Questions
Which has greater displacement, the Doha-class or Project 1241.1 Molnaya-class?
The Doha-class has greater displacement at 3,300 tons compared to the Project 1241.1 Molnaya-class's 549 tons.
Which is faster, the Doha-class or Project 1241.1 Molnaya-class?
The Project 1241.1 Molnaya-class is faster with a maximum speed of 42 knots compared to the Doha-class's 28 knots.
Which has longer range, the Doha-class or Project 1241.1 Molnaya-class?
The Project 1241.1 Molnaya-class has a longer range at 2,400 nautical miles compared to the Doha-class's 0 nautical miles.
Which is longer, the Doha-class or Project 1241.1 Molnaya-class?
The Doha-class is longer at 107.0 meters compared to the Project 1241.1 Molnaya-class's 56.0 meters.
How many crew members do the Doha-class and Project 1241.1 Molnaya-class have?
The Doha-class has a larger crew complement of 98 compared to the Project 1241.1 Molnaya-class's 50 crew members.
Which has been built in greater numbers, the Doha-class or Project 1241.1 Molnaya-class?
The Project 1241.1 Molnaya-class has been built in greater numbers with 80 vessels compared to 4 vessels of the Doha-class.