Göteborg vs Project 1241.1 Molnaya
The Göteborg and the Project 1241.1 Molnaya are both Corvette classes. Displacement is 425 tons for the Göteborg vs 549 tons for the Project 1241.1 Molnaya. The Göteborg reaches 30 knots vs 42 knots for the Project 1241.1 Molnaya. Operational range is 2,000 nautical miles for the Göteborg vs 2,400 for the Project 1241.1 Molnaya. The Göteborg carries a crew of 41 vs 50 for the Project 1241.1 Molnaya. The Göteborg was produced in 4 units vs 80 for the Project 1241.1 Molnaya. The Göteborg was commissioned in 1989, 12 years after the Project 1241.1 Molnaya (1977).
| Swedish corvette, introduced in 1989, utilizes a water jet propulsion system. | |
| Origin | 🇸🇪 Sweden |
| Category | Corvette |
| Type | Corvette |
| Manufacturer | Karlskronavarvet AB |
| Year introduced | 1989 |
| Number built | 4 units |
| Estimated unit price | NA |
| Displacement | 425 tons ◉ |
| Maximum speed | 30.0 knots ◉ |
| Range | 2,000 nm ◉ |
| Length | 57.0 m ◉ |
| Beam | 8.0 m ◉ |
| Crew | 41 ◉ |
| Propulsion | 3 × MTU diesel engines at 2,560 kW (3,430 hp)/each, Water jet propulsion system |
| Armament |
|
| Displacement | 549 tons ◉ |
| Maximum speed | 42.0 knots ◉ |
| Range | 2,400 nm at 12 knots ◉ |
| Length | 56.0 m ◉ |
| Beam | 10.5 m ◉ |
| Crew | 50 ◉ |
| Propulsion | 2 shaft COGAG turbines at 11,000 hp each, plus 2 cruising engines at 4,000 hp each |
| Armament |
|
Performance Radar Chart
Frequently Asked Questions
Which has greater displacement, the Göteborg-class or Project 1241.1 Molnaya-class?
The Project 1241.1 Molnaya-class has greater displacement at 549 tons compared to the Göteborg-class's 425 tons.
Which is faster, the Göteborg-class or Project 1241.1 Molnaya-class?
The Project 1241.1 Molnaya-class is faster with a maximum speed of 42 knots compared to the Göteborg-class's 30 knots.
Which has longer range, the Göteborg-class or Project 1241.1 Molnaya-class?
The Project 1241.1 Molnaya-class has a longer range at 2,400 nautical miles compared to the Göteborg-class's 2,000 nautical miles.
Which is longer, the Göteborg-class or Project 1241.1 Molnaya-class?
The Göteborg-class is longer at 57.0 meters compared to the Project 1241.1 Molnaya-class's 56.0 meters.
How many crew members do the Göteborg-class and Project 1241.1 Molnaya-class have?
The Project 1241.1 Molnaya-class has a larger crew complement of 50 compared to the Göteborg-class's 41 crew members.
Which has been built in greater numbers, the Göteborg-class or Project 1241.1 Molnaya-class?
The Project 1241.1 Molnaya-class has been built in greater numbers with 80 vessels compared to 4 vessels of the Göteborg-class.