Astute vs Improved Kilo
Overview
The Astute and the Improved Kilo are both Submarine classes.
The Astute displaces 7,400 tons — 3.2x the Improved Kilo's 2,325 tons. The Astute reaches 10 knots vs 12 knots for the Improved Kilo. Operational range is 99,999 nautical miles for the Astute vs 7,500 for the Improved Kilo. The Astute carries a crew of 98 vs 52 for the Improved Kilo. Submerged displacement is 7,800 tons for the Astute vs 3,075 tons for the Improved Kilo. The Astute can dive to 300 m compared to 300 m for the Improved Kilo.
The Astute was produced in 6 units vs 75 for the Improved Kilo. Cost per hull is $2,112M for the Astute vs $200M for the Improved Kilo. The Astute was commissioned in 2010, 30 years after the Improved Kilo (1980).
| British nuclear-powered submarine, 7,400 tons displacement, entered service in 2010. | |
| Origin | 🇬🇧 United Kingdom |
| Category | Submarine |
| Type | Nuclear-powered attack submarine |
| Manufacturer | BAE Systems Submarines |
| Year introduced | 2010 |
| Number built | 6 units |
| Estimated unit price | $2,112 million |
| Displacement | 7,400 tons ◉ |
| Maximum speed | 10.0 knots ◉ |
| Range | Unlimited ◉ |
| Length | 97.0 m ◉ |
| Beam | 11.3 m ◉ |
| Crew | 98 ◉ |
| Max depth | 300 m ◉ |
| Propulsion | 1 × Rolls-Royce PWR2 nuclear reactor; MTU 600 kilowatt diesel generators |
| Armament |
|
| Displacement | 2,325 tons ◉ |
| Maximum speed | 12.0 knots ◉ |
| Range | 7,500 nm at 7 knots ◉ |
| Length | 72.6 m ◉ |
| Beam | 9.9 m ◉ |
| Crew | 52 ◉ |
| Max depth | 300 m ◉ |
| Propulsion | Diesel-electric propulsion; 2 × 1000 kW diesel generators; 1 × 5,500–6,800 shp (4,100–5,100 kW) propulsion motor; 1 × fixed-pitch 6-bladed or 7-bladed propeller |
| Armament |
|
Performance Radar Chart
Detailed Comparison
Generating comparison analysis...
Unable to generate comparison at this time.