Kresta I & II vs Project 1155
Kresta I & II vs Project 1155 at a glance — displacement 7,535 vs 7,570 tons, length 159 vs 163 m, speed 34 vs 29 knots, crew 380 vs 300.
Specifications
|
Kresta I & II |
Project 1155 |
| Origin |
🇷🇺 Ex-USSR |
🇷🇺 Ex-USSR |
| Category |
Cruiser |
Destroyer |
| Type |
Guided-missile cruiser |
Guided-missile destroyer |
| Manufacturer |
Zhdanov Shipyard |
Yantar Shipyard |
| Year introduced |
1969 |
1980 |
| Number built |
10 units |
13 units |
| Estimated unit price |
NA |
NA |
| Displacement |
7,535 tons |
7,570 tons |
| Maximum speed |
34.0 knots |
29.0 knots |
| Range |
10,500 nm at 14 knots |
10,500 nm at 14 knots |
| Length |
159.0 m |
163.0 m |
| Beam |
17.0 m |
19.3 m |
| Crew |
380 |
300 |
Armament & Systems
|
Kresta I & II |
Project 1155 |
| Armament |
- 2 × quad SS-N-14 'Silex' anti-submarine missiles
- 2 × twin SA-N-3 'Goblet' surface-to-air missile launchers (72 missiles)
- 2 × twin 57-mm/70-cal AK-725 anti-aircraft guns
- 4 × 30mm AK-630 CIWS
- 2 × quintuple 533mm torpedo tubes
- 2 x RBU-6000 12-barrel anti-submarine rocket launchers
- 2 x RBU-1000 6-barrel anti-submarine rocket launchers
|
- 2 × 1 AK-100 100 mm naval guns
- 8 (2 × 4) SS-N-14 'Silex' anti-submarine/anti-ship missiles
- 64 (8 × 8) VLS cells for SA-N-9 'Gauntlet' surface-to-air missiles
- 4 × 6 30 mm AK-630 CIWS
- 2 × 1 21KM AA guns
- 2 × 4 533 mm torpedo tubes for Type 53 torpedoes
- 2 × 12 RBU-6000 anti-submarine rocket launchers
- 1 × 2 AK-130 130 mm naval guns (Udaloy II)
- 8 (2 × 4) SS-N-22 'Sunburn' anti-ship missiles (Udaloy II)
- 2 × Kashtan CIWS (Udaloy II)
- 2 × 4 553 mm torpedo tubes for SS-N-16 'Stallion' anti-submarine missiles (Udaloy II)
- 2 × 10 RBU-12000 anti-submarine rocket launchers (Udaloy II)
|
| Propulsion |
2 shaft steam turbines, 4 boilers, 91,000–100,000 shp |
2-shaft COGAG, 2 × D090 6.7 MW and 2 × DT59 16.7 gas turbines, 120,000 hp (89 MW) |
Detailed Comparison
Loading analysis...
Generating comparison analysis...
Unable to generate comparison at this time.
Explore further
Former operators · 10 built
Largest operators · in service
Change comparison
vs
Which has greater displacement, the Kresta I & II-class or Project 1155-class?
The Project 1155-class has greater displacement at 7,570 tons compared to the Kresta I & II-class's 7,535 tons.
Which is faster, the Kresta I & II-class or Project 1155-class?
The Kresta I & II-class is faster with a maximum speed of 34 knots compared to the Project 1155-class's 29 knots.
Which has longer range, the Kresta I & II-class or Project 1155-class?
Both the Kresta I & II-class and Project 1155-class have a range of 10,500 nautical miles.
Which is longer, the Kresta I & II-class or Project 1155-class?
The Project 1155-class is longer at 163.0 meters compared to the Kresta I & II-class's 159.0 meters.
How many crew members do the Kresta I & II-class and Project 1155-class have?
The Kresta I & II-class has a larger crew complement of 380 compared to the Project 1155-class's 300 crew members.
Which has been built in greater numbers, the Kresta I & II-class or Project 1155-class?
The Project 1155-class has been built in greater numbers with 13 vessels compared to 10 vessels of the Kresta I & II-class.