GlobalMilitary.net Open-source military intelligence Updated daily

Project 22160 vs Sentinel

Project 22160 vs Sentinel at a glance — displacement 1,700 vs 359 tons, length 94 vs 46 m, speed 27 vs 28 knots, crew 80 vs 24.

Specifications
Project 22160 Sentinel
Origin 🇷🇺 Russia 🇺🇸 United States
Category Patrol vessel Patrol vessel
Type Offshore patrol vessel Cutter
Manufacturer Zelenodolsk Shipyard, Zaliv Shipyard Bollinger Shipyards
Year introduced 2018 2012
Number built 5 units 61 units
Estimated unit price NA $65 million
Displacement 1,700 tons 359 tons
Maximum speed 27.0 knots 28.0 knots
Range 6,000 nm 2,500 nm
Length 94.0 m 46.8 m
Beam 14.0 m 8.1 m
Crew 80 24
Performance Radar Chart
Armament & Systems
Project 22160 Sentinel
Armament
  • 1 × 76.2 mm AK-176MA dual-purpose gun
  • Tor-M2KM SAM system (added to active units in 2022)
  • 2 × 14.5 mm MTPU machine guns
  • DP-65 and DP-64 anti-saboteur grenade launchers
  • Modular containers for Paket-NK torpedoes, Kh-35 or Kalibr-NK missiles (proposed)
  • 1 × Mk 38 Mod 2 25 mm machine gun system
  • 4 × crew-served Browning M2 machine guns
Propulsion CODAG: 2 × Kolomna 16D49 diesels (6,000 hp each) + 2 boost gas turbines 2 × 4,300 kW (5,800 shp) MTU diesel engines, 1 × 75 kW (101 shp) bow thruster
Change comparison vs

Frequently Asked Questions

Which has greater displacement, the Project 22160-class or Sentinel-class?
The Project 22160-class has greater displacement at 1,700 tons compared to the Sentinel-class's 359 tons.
Which is faster, the Project 22160-class or Sentinel-class?
The Sentinel-class is faster with a maximum speed of 28 knots compared to the Project 22160-class's 27 knots.
Which has longer range, the Project 22160-class or Sentinel-class?
The Project 22160-class has a longer range at 6,000 nautical miles compared to the Sentinel-class's 2,500 nautical miles.
Which is longer, the Project 22160-class or Sentinel-class?
The Project 22160-class is longer at 94.0 meters compared to the Sentinel-class's 46.8 meters.
How many crew members do the Project 22160-class and Sentinel-class have?
The Project 22160-class has a larger crew complement of 80 compared to the Sentinel-class's 24 crew members.
Which has been built in greater numbers, the Project 22160-class or Sentinel-class?
The Sentinel-class has been built in greater numbers with 61 vessels compared to 5 vessels of the Project 22160-class.