Kamorta vs Project 133
Kamorta vs Project 133 at a glance — displacement 3,500 vs 950 tons, length 109 vs 72 m, speed 25 vs 24 knots, crew 123 vs 80.
Specifications
|
Kamorta |
Project 133 |
| Origin |
🇮🇳 India |
🇩🇪 Ex-East Germany |
| Category |
Corvette |
Corvette |
| Type |
Anti-submarine corvette |
Anti-submarine corvette |
| Manufacturer |
Garden Reach Shipbuilders and Engineers |
Peene-Werft |
| Year introduced |
2014 |
1981 |
| Number built |
4 units |
28 units |
| Estimated unit price |
$350 million |
$1 million |
| Displacement |
3,500 tons |
950 tons |
| Maximum speed |
25.0 knots |
24.0 knots |
| Range |
3,450 nm at 16 knots |
2,100 nm at 12 knots |
| Length |
109.0 m |
72.0 m |
| Beam |
13.7 m |
9.4 m |
| Crew |
123 |
80 |
Armament & Systems
|
Kamorta |
Project 133 |
| Armament |
- 1 × OTO Melara 76 mm Super Rapid Gun Mount (SRGM)
- 2 x AK-630M CIWS
- 32 × VL-SRSAM (planned)
- 2 × RBU-6000 (IRL) anti-submarine rocket launcher
- 2 x twin 533 mm torpedo tubes (Varunastra)
|
- 1x twin 57 mm gun AK-725
- 1x twin 30 mm gun AK-230
- 2x SA-N-5 MANPAD positions
- 2x RBU-6000 anti submarine depth charge rocket launchers
- 4x 400 mm torpedo tubes
- 12 depth charges
|
| Propulsion |
CODAD: 4 × Pielstick 12PA 6 STC6 Diesel engines with a power of 20,384 hp |
3 shaft M504 diesels with a power of 14,250 hp |
Detailed Comparison
Loading analysis...
Generating comparison analysis...
Unable to generate comparison at this time.
Change comparison
vs
Which has greater displacement, the Kamorta-class or Project 133-class?
The Kamorta-class has greater displacement at 3,500 tons compared to the Project 133-class's 950 tons.
Which is faster, the Kamorta-class or Project 133-class?
The Kamorta-class is faster with a maximum speed of 25 knots compared to the Project 133-class's 24 knots.
Which has longer range, the Kamorta-class or Project 133-class?
The Kamorta-class has a longer range at 3,450 nautical miles compared to the Project 133-class's 2,100 nautical miles.
Which is longer, the Kamorta-class or Project 133-class?
The Kamorta-class is longer at 109.0 meters compared to the Project 133-class's 72.0 meters.
How many crew members do the Kamorta-class and Project 133-class have?
The Kamorta-class has a larger crew complement of 123 compared to the Project 133-class's 80 crew members.
Which is more expensive, the Kamorta-class or Project 133-class?
The Kamorta-class is more expensive at approximately $350 million per unit compared to the Project 133-class at $1 million.
Which has been built in greater numbers, the Kamorta-class or Project 133-class?
The Project 133-class has been built in greater numbers with 28 vessels compared to 4 vessels of the Kamorta-class.