GlobalMilitary.net Open-source military intelligence Updated daily

Project 133 vs Skjold

Project 133 vs Skjold at a glance — displacement 950 vs 274 tons, length 72 vs 47 m, speed 24 vs 60 knots, crew 80 vs 16.

Specifications
Project 133 Skjold
Origin 🇩🇪 Ex-East Germany 🇳🇴 Norway
Category Corvette Corvette
Type Anti-submarine corvette Coastal corvette
Manufacturer Peene-Werft Umoe Mandal
Year introduced 1981 1999
Number built 28 units 6 units
Estimated unit price $1 million NA
Displacement 950 tons 274 tons
Maximum speed 24.0 knots 60.0 knots
Range 2,100 nm at 12 knots 800 nm at 40 knots
Length 72.0 m 47.5 m
Beam 9.4 m 13.5 m
Crew 80 16
Performance Radar Chart
Armament & Systems
Project 133 Skjold
Armament
  • 1x twin 57 mm gun AK-725
  • 1x twin 30 mm gun AK-230
  • 2x SA-N-5 MANPAD positions
  • 2x RBU-6000 anti submarine depth charge rocket launchers
  • 4x 400 mm torpedo tubes
  • 12 depth charges
  • 8 × Kongsberg Naval Strike Missile SSMs
  • 1 × 76mm Otobreda Super Rapid multi-role cannon
  • 2 × 12.7mm Browning M2HB HMGs
  • Portable SIMBAD version Mistral SAMs
  • Protector (RWS) (Sea Protector)
Propulsion 3 shaft M504 diesels with a power of 14,250 hp Renk COGAG 2 × Pratt & Whitney ST18M plus 2 × Pratt & Whitney ST40M gas turbines → 12,170 kilowatts
Change comparison vs

Frequently Asked Questions

Which has greater displacement, the Project 133-class or Skjold-class?
The Project 133-class has greater displacement at 950 tons compared to the Skjold-class's 274 tons.
Which is faster, the Project 133-class or Skjold-class?
The Skjold-class is faster with a maximum speed of 60 knots compared to the Project 133-class's 24 knots.
Which has longer range, the Project 133-class or Skjold-class?
The Project 133-class has a longer range at 2,100 nautical miles compared to the Skjold-class's 800 nautical miles.
Which is longer, the Project 133-class or Skjold-class?
The Project 133-class is longer at 72.0 meters compared to the Skjold-class's 47.5 meters.
How many crew members do the Project 133-class and Skjold-class have?
The Project 133-class has a larger crew complement of 80 compared to the Skjold-class's 16 crew members.
Which has been built in greater numbers, the Project 133-class or Skjold-class?
The Project 133-class has been built in greater numbers with 28 vessels compared to 6 vessels of the Skjold-class.