Project 133 vs Poti
Overview
The Project 133 and the Poti are both Corvette classes.
Displacement is 950 tons for the Project 133 vs 589 tons for the Poti. The Project 133 reaches 24 knots vs 38 knots for the Poti. Operational range is 2,100 nautical miles for the Project 133 vs 4,500 for the Poti. The Project 133 carries a crew of 80 vs 80 for the Poti.
The Project 133 was produced in 28 units vs 66 for the Poti. The Project 133 was commissioned in 1981, 21 years after the Poti (1960).
| East German corvette, introduced in 1981, displaced 950 tons, and was powered by three M504 diesels. | |
| Origin | 🇩🇪 Ex-East Germany |
| Category | Corvette |
| Type | Anti-submarine corvette |
| Manufacturer | Peene-Werft |
| Year introduced | 1981 |
| Number built | 28 units |
| Estimated unit price | $12 million |
| Displacement | 950 tons ◉ |
| Maximum speed | 24.0 knots ◉ |
| Range | 2,100 nm at 12 knots ◉ |
| Length | 72.0 m ◉ |
| Beam | 9.4 m ◉ |
| Crew | 80 ◉ |
| Propulsion | 3 shaft M504 diesels with a power of 14,250 hp |
| Armament |
|
| Displacement | 589 tons ◉ |
| Maximum speed | 38.0 knots ◉ |
| Range | 4,500 nm at 520 knots ◉ |
| Length | 59.4 m ◉ |
| Beam | 7.9 m ◉ |
| Crew | 80 ◉ |
| Propulsion | 2 shaft CODAG, 2 gas turbines 22,371 kW (30,000 shp) and 2 M503A diesels 5,966 kW (8,000 bhp) |
| Armament |
|
Performance Radar Chart
Detailed Comparison
Loading analysis...
Generating comparison analysis...
Unable to generate comparison at this time.
Frequently Asked Questions
Which has greater displacement, the Project 133-class or Poti-class?
The Project 133-class has greater displacement at 950 tons compared to the Poti-class's 589 tons.
Which is faster, the Project 133-class or Poti-class?
The Poti-class is faster with a maximum speed of 38 knots compared to the Project 133-class's 24 knots.
Which has longer range, the Project 133-class or Poti-class?
The Poti-class has a longer range at 4,500 nautical miles compared to the Project 133-class's 2,100 nautical miles.
Which is longer, the Project 133-class or Poti-class?
The Project 133-class is longer at 72.0 meters compared to the Poti-class's 59.4 meters.
How many crew members do the Project 133-class and Poti-class have?
The Poti-class has a larger crew complement of 80 compared to the Project 133-class's 80 crew members.
Which has been built in greater numbers, the Project 133-class or Poti-class?
The Poti-class has been built in greater numbers with 66 vessels compared to 28 vessels of the Project 133-class.