Project 133 vs Project 1241.1 Molniya
Project 133 vs Project 1241.1 Molniya at a glance — displacement 950 vs 549 tons, length 72 vs 56 m, speed 24 vs 42 knots, crew 80 vs 50.
Specifications
|
Project 133 |
Project 1241.1 Molniya |
| Origin |
🇩🇪 Ex-East Germany |
🇷🇺 Ex-USSR |
| Category |
Corvette |
Corvette |
| Type |
Anti-submarine corvette |
Missile corvette |
| Manufacturer |
Peene-Werft |
Vympel Shipyard |
| Year introduced |
1981 |
1977 |
| Number built |
28 units |
80 units |
| Estimated unit price |
$1 million |
$30 million |
| Displacement |
950 tons |
549 tons |
| Maximum speed |
24.0 knots |
42.0 knots |
| Range |
2,100 nm at 12 knots |
2,400 nm at 12 knots |
| Length |
72.0 m |
56.0 m |
| Beam |
9.4 m |
10.5 m |
| Crew |
80 |
50 |
Armament & Systems
|
Project 133 |
Project 1241.1 Molniya |
| Armament |
- 1x twin 57 mm gun AK-725
- 1x twin 30 mm gun AK-230
- 2x SA-N-5 MANPAD positions
- 2x RBU-6000 anti submarine depth charge rocket launchers
- 4x 400 mm torpedo tubes
- 12 depth charges
|
- 4 × P-15 Termit/SS-N-2 Styx or 4 × P-270 Moskit/SS-N-22 Sunburn or 16 × Kh-35 Uran/SS-N-25 Switchblade anti-ship missiles or 4 × BrahMos
- 1 SA-N-5 SAM (1x4) MANPADS air defence missiles
- 1 × 76 mm AK-176 dual purpose main gun
- 2 × AK-630 30 mm gun or 1 × CADS-N-1 Kashtan CIWS
|
| Propulsion |
3 shaft M504 diesels with a power of 14,250 hp |
2 shaft COGAG turbines at 11,000 hp each, plus 2 cruising engines at 4,000 hp each |
Detailed Comparison
Loading analysis...
Generating comparison analysis...
Unable to generate comparison at this time.
Change comparison
vs
Which has greater displacement, the Project 133-class or Project 1241.1 Molniya-class?
The Project 133-class has greater displacement at 950 tons compared to the Project 1241.1 Molniya-class's 549 tons.
Which is faster, the Project 133-class or Project 1241.1 Molniya-class?
The Project 1241.1 Molniya-class is faster with a maximum speed of 42 knots compared to the Project 133-class's 24 knots.
Which has longer range, the Project 133-class or Project 1241.1 Molniya-class?
The Project 1241.1 Molniya-class has a longer range at 2,400 nautical miles compared to the Project 133-class's 2,100 nautical miles.
Which is longer, the Project 133-class or Project 1241.1 Molniya-class?
The Project 133-class is longer at 72.0 meters compared to the Project 1241.1 Molniya-class's 56.0 meters.
How many crew members do the Project 133-class and Project 1241.1 Molniya-class have?
The Project 133-class has a larger crew complement of 80 compared to the Project 1241.1 Molniya-class's 50 crew members.
Which is more expensive, the Project 133-class or Project 1241.1 Molniya-class?
The Project 1241.1 Molniya-class is more expensive at approximately $30 million per unit compared to the Project 133-class at $1 million.
Which has been built in greater numbers, the Project 133-class or Project 1241.1 Molniya-class?
The Project 1241.1 Molniya-class has been built in greater numbers with 80 vessels compared to 28 vessels of the Project 133-class.