German Navy P-8A Poseidon Delivered
Event Report
German Navy
| Date | Dec. 18, 2025 |
| Country | 🇩🇪 Germany |
| Force | German Navy |
| Location |
Nordholz Naval Airbase, Germany
53.77, 8.66 |
| Aircraft | P-8A Poseidon (P-8 Poseidon) |
| Event type | Delivered |
| Change | +1 active -1 ordered |
Description
The German Navy's second P-8A Poseidon, 63+02, landed at Nordholz in the early morning of 18 December 2025, Flug Revue reported, two days after leaving Boeing Field in Seattle with its national markings taped over. With 63+01, delivered in November, the aircraft restored Naval Air Wing 3 to the number of maritime patrol aircraft it had previously flown with the P-3C Orion. Eight P-8As are on order for the German Navy.
Sources
