KT-100 vs SW-4 Puszczyk
KT-100 vs SW-4 Puszczyk at a glance — top speed 389 vs 260 km/h, range 1,900 vs 790 km, max takeoff weight 1,633 vs 1,800 kg, built 23 vs 40 units.
Specifications
|
KT-100 |
SW-4 Puszczyk |
| Origin country |
🇰🇷 South Korea |
🇵🇱 Poland |
| Category |
Military Training Aircraft |
Military Training Aircraft |
| Manufacturer |
KAI |
PZL-Świdnik |
| First flight |
20 July 2011 |
29 October 1996 |
| Year introduced |
2015 |
2002 |
| Number produced |
23 units |
40 units |
| Average unit price |
$570K |
$700K |
| Wingspan |
11.3 m |
9.0 m |
| Height |
2.7 m |
3.1 m |
| Length |
8.0 m |
10.6 m |
| Maximum speed |
389 km/h |
260 km/h |
| Operational range |
1,900 km |
790 km |
| Service ceiling |
5,304 m |
5,200 m |
| Max. takeoff weight |
1,633 kg |
1,800 kg |
| Empty weight |
1,089 kg |
1,050 kg |
| Total thrust |
1 x 235 kW
|
1 x 336 kW
|
Detailed Comparison
Loading analysis...
Generating comparison analysis...
Unable to generate comparison at this time.
Change comparison
vs
Which is faster, the KT-100 or SW-4 Puszczyk?
The KT-100 is faster with a maximum speed of 389 km/h compared to the SW-4 Puszczyk's 260 km/h, a difference of 129 km/h.
Which has longer range, the KT-100 or SW-4 Puszczyk?
The KT-100 has a longer range at 1,900 km compared to the SW-4 Puszczyk's 790 km.
Which can fly higher, the KT-100 or SW-4 Puszczyk?
The KT-100 has a higher service ceiling at 5,304 meters (17,401 ft) compared to the SW-4 Puszczyk's 5,200 meters (17,060 ft).
Which is heavier, the KT-100 or SW-4 Puszczyk?
The SW-4 Puszczyk has a higher maximum takeoff weight at 1,800 kg compared to the KT-100's 1,633 kg.
Which is larger, the KT-100 or SW-4 Puszczyk?
The SW-4 Puszczyk is longer at 10.6 meters compared to the KT-100's 8.0 meters.
Which is more expensive, the KT-100 or SW-4 Puszczyk?
The SW-4 Puszczyk is more expensive at approximately $0.7 million per unit compared to the KT-100 at $0.6 million.
Which entered service first, the KT-100 or SW-4 Puszczyk?
The SW-4 Puszczyk entered service first in 2002, 13 years before the KT-100 which entered service in 2015.
Which has been built in greater numbers, the KT-100 or SW-4 Puszczyk?
The SW-4 Puszczyk has been produced in greater numbers with 40 units compared to 23 units of the KT-100.