GlobalMilitary.net Open-source military intelligence Updated daily

L-90 Redigo vs M-346 Master

L-90 Redigo vs M-346 Master at a glance — top speed 354 vs 1,092 km/h, range 1,000 vs 1,925 km, max takeoff weight 1,900 vs 9,500 kg, built 31 vs 92 units.

Valmet L-90 Redigo military training aircraft side profile drawing
🇫🇮 L-90 Redigo
Aermacchi M-346 Master military training aircraft side profile drawing
🇮🇹 M-346 Master
Specifications
L-90 Redigo M-346 Master
Origin country 🇫🇮 Finland 🇮🇹 Italy
Category Military Training Aircraft Military Training Aircraft
Manufacturer Valmet Aermacchi
First flight 12 February 1985 15 July 2004
Year introduced 1991 2015
Number produced 31 units 92 units
Average unit price -- $40 million
Wing area 14.8 m² 23.5 m²
Wingspan 10.6 m 9.7 m
Height 3.2 m 4.8 m
Length 8.5 m 11.5 m
Maximum speed 354 km/h 1092 km/h
Operational range 1,000 km 1,925 km
Service ceiling 6,340 m 13,716 m
Max. takeoff weight 1,900 kg 9,500 kg
Empty weight 970 kg 4,610 kg
Total thrust 1 x 340 kW 2 x 2,835 kgf
Performance Radar Chart
Change comparison vs

Frequently Asked Questions

Which is faster, the L-90 Redigo or M-346 Master?
The M-346 Master is faster with a maximum speed of 1,092 km/h compared to the L-90 Redigo's 354 km/h, a difference of 738 km/h.
Which has longer range, the L-90 Redigo or M-346 Master?
The M-346 Master has a longer range at 1,925 km compared to the L-90 Redigo's 1,000 km.
Which can fly higher, the L-90 Redigo or M-346 Master?
The M-346 Master has a higher service ceiling at 13,716 meters (45,000 ft) compared to the L-90 Redigo's 6,340 meters (20,800 ft).
Which is heavier, the L-90 Redigo or M-346 Master?
The M-346 Master has a higher maximum takeoff weight at 9,500 kg compared to the L-90 Redigo's 1,900 kg.
Which is larger, the L-90 Redigo or M-346 Master?
The M-346 Master is longer at 11.5 meters compared to the L-90 Redigo's 8.5 meters.
Which entered service first, the L-90 Redigo or M-346 Master?
The L-90 Redigo entered service first in 1991, 24 years before the M-346 Master which entered service in 2015.
Which has been built in greater numbers, the L-90 Redigo or M-346 Master?
The M-346 Master has been produced in greater numbers with 92 units compared to 31 units of the L-90 Redigo.