MB-326K vs T-35 Pillan
MB-326K vs T-35 Pillan at a glance — top speed 806 vs 311 km/h, range 1,850 vs 1,093 km, max takeoff weight 3,765 vs 1,338 kg, built 800 vs 154 units.
Specifications
|
MB-326K |
T-35 Pillan |
| Origin country |
🇮🇹 Italy |
🇨🇱 Chile |
| Category |
Military Training Aircraft |
Military Training Aircraft |
| Manufacturer |
Aermacchi |
ENAER |
| First flight |
10 December 1957 |
6 March 1981 |
| Year introduced |
1962 |
1984 |
| Number produced |
800 units |
154 units |
| Average unit price |
-- |
-- |
| Wing area |
19.0 m² |
13.7 m² |
| Wingspan |
10.6 m |
8.8 m |
| Height |
3.7 m |
2.6 m |
| Length |
10.7 m |
8.0 m |
| Maximum speed |
806 km/h |
311 km/h |
| Operational range |
1,850 km |
1,093 km |
| Service ceiling |
12,497 m |
5,840 m |
| Max. takeoff weight |
3,765 kg |
1,338 kg |
| Empty weight |
2,237 kg |
930 kg |
| Total thrust |
1 x 1,134 kgf
|
1 x 224 kW
|
Detailed Comparison
Loading analysis...
Generating comparison analysis...
Unable to generate comparison at this time.
Change comparison
vs
Which is faster, the MB-326K or T-35 Pillan?
The MB-326K is faster with a maximum speed of 806 km/h compared to the T-35 Pillan's 311 km/h, a difference of 495 km/h.
Which has longer range, the MB-326K or T-35 Pillan?
The MB-326K has a longer range at 1,850 km compared to the T-35 Pillan's 1,093 km.
Which can fly higher, the MB-326K or T-35 Pillan?
The MB-326K has a higher service ceiling at 12,497 meters (41,000 ft) compared to the T-35 Pillan's 5,840 meters (19,160 ft).
Which is heavier, the MB-326K or T-35 Pillan?
The MB-326K has a higher maximum takeoff weight at 3,765 kg compared to the T-35 Pillan's 1,338 kg.
Which is larger, the MB-326K or T-35 Pillan?
The MB-326K is longer at 10.7 meters compared to the T-35 Pillan's 8.0 meters.
Which entered service first, the MB-326K or T-35 Pillan?
The MB-326K entered service first in 1962, 22 years before the T-35 Pillan which entered service in 1984.
Which has been built in greater numbers, the MB-326K or T-35 Pillan?
The MB-326K has been produced in greater numbers with 800 units compared to 154 units of the T-35 Pillan.