GlobalMilitary.net Open-source military intelligence Updated daily

Kapitan Pattimura vs Project 133

Kapitan Pattimura vs Project 133 at a glance — displacement 950 vs 950 tons, length 72 vs 72 m, speed 24 vs 24 knots, crew 80 vs 80.

Specifications
Kapitan Pattimura Project 133
Origin 🇩🇪 Germany 🇩🇪 Ex-East Germany
Category Corvette Corvette
Type Anti-submarine corvette Anti-submarine corvette
Manufacturer Peene-Werft Peene-Werft
Year introduced 1981 1981
Number built 28 units 28 units
Estimated unit price $1 million $1 million
Displacement 950 tons 950 tons
Maximum speed 24.0 knots 24.0 knots
Range 2,100 nm 2,100 nm at 12 knots
Length 72.0 m 72.0 m
Beam 9.4 m 9.4 m
Crew 80 80
Performance Radar Chart
Armament & Systems
Kapitan Pattimura Project 133
Armament
  • 1 x twin 57 mm gun AK-725
  • 1 x twin 30 mm gun AK-230
  • 2 x SA-N-5 MANPAD positions
  • 2 x RBU-6000 anti submarine depth charge rocket launchers
  • 4 x 400 mm torpedo tubes
  • 12 depth charges
  • 1x twin 57 mm gun AK-725
  • 1x twin 30 mm gun AK-230
  • 2x SA-N-5 MANPAD positions
  • 2x RBU-6000 anti submarine depth charge rocket launchers
  • 4x 400 mm torpedo tubes
  • 12 depth charges
Propulsion 3 shaft M504 diesels with a power of 14,250 hp 3 shaft M504 diesels with a power of 14,250 hp
Change comparison vs

Frequently Asked Questions

Which has greater displacement, the Kapitan Pattimura-class or Project 133-class?
The Project 133-class has greater displacement at 950 tons compared to the Kapitan Pattimura-class's 950 tons.
Which is faster, the Kapitan Pattimura-class or Project 133-class?
The Project 133-class is faster with a maximum speed of 24 knots compared to the Kapitan Pattimura-class's 24 knots.
Which has longer range, the Kapitan Pattimura-class or Project 133-class?
The Project 133-class has a longer range at 2,100 nautical miles compared to the Kapitan Pattimura-class's 2,100 nautical miles.
Which is longer, the Kapitan Pattimura-class or Project 133-class?
The Project 133-class is longer at 72.0 meters compared to the Kapitan Pattimura-class's 72.0 meters.
How many crew members do the Kapitan Pattimura-class and Project 133-class have?
The Project 133-class has a larger crew complement of 80 compared to the Kapitan Pattimura-class's 80 crew members.
Which is more expensive, the Kapitan Pattimura-class or Project 133-class?
The Project 133-class is more expensive at approximately $1 million per unit compared to the Kapitan Pattimura-class at $1 million.
Which has been built in greater numbers, the Kapitan Pattimura-class or Project 133-class?
Both the Kapitan Pattimura-class and Project 133-class have been built in equal numbers with 28 vessels each.