Project 1241.2 Molnaya 2 vs Project 1241.1 Molnaya
Overview
The Project 1241.2 Molnaya 2 and the Project 1241.1 Molnaya are both Corvette classes.
Displacement is 589 tons for the Project 1241.2 Molnaya 2 vs 549 tons for the Project 1241.1 Molnaya. The Project 1241.2 Molnaya 2 reaches 34 knots vs 42 knots for the Project 1241.1 Molnaya. Operational range is 1,650 nautical miles for the Project 1241.2 Molnaya 2 vs 2,400 for the Project 1241.1 Molnaya. The Project 1241.2 Molnaya 2 carries a crew of 40 vs 50 for the Project 1241.1 Molnaya.
The Project 1241.2 Molnaya 2 was produced in 36 units vs 80 for the Project 1241.1 Molnaya. The Project 1241.2 Molnaya 2 was commissioned in 1979, 2 years after the Project 1241.1 Molnaya (1977).
| Ex-USSR corvette, introduced in 1979, displacing 589 tons, propelled by two diesel engines. | |
| Origin | 🇨🇳 Ex-USSR |
| Category | Corvette |
| Type | Anti-submarine corvette |
| Manufacturer | Vostochnaya Verf |
| Year introduced | 1979 |
| Number built | 36 units |
| Estimated unit price | NA |
| Displacement | 589 tons ◉ |
| Maximum speed | 34.0 knots ◉ |
| Range | 1,650 nm at 14 knots ◉ |
| Length | 57.0 m ◉ |
| Beam | 9.4 m ◉ |
| Crew | 40 ◉ |
| Propulsion | 2 shaft M504 diesels, 20,000 shp (14,914 kW) |
| Armament |
|
| Displacement | 549 tons ◉ |
| Maximum speed | 42.0 knots ◉ |
| Range | 2,400 nm at 12 knots ◉ |
| Length | 56.0 m ◉ |
| Beam | 10.5 m ◉ |
| Crew | 50 ◉ |
| Propulsion | 2 shaft COGAG turbines at 11,000 hp each, plus 2 cruising engines at 4,000 hp each |
| Armament |
|
Performance Radar Chart
Detailed Comparison
Generating comparison analysis...
Unable to generate comparison at this time.