GlobalMilitary.net Open-source military intelligence Updated daily

Airbus A321 vs BD-700 Global Express

Airbus A321 vs BD-700 Global Express at a glance — top speed 871 vs 950 km/h, range 5,930 vs 11,100 km, max takeoff weight 78,000 vs 45,132 kg, built 2,917 vs 816 units.

Specifications
Airbus A321 BD-700 Global Express
Origin country 🇪🇺 Europe 🇨🇦 Canada
Category Military Transport Aircraft Military Transport Aircraft
Manufacturer Airbus Bombardier
First flight 27 February 1987 13 October 1996
Year introduced 1994 1999
Number produced 2917 units 816 units
Average unit price $120 million $25 million
Wing area 122.6 m² 95.0 m²
Wingspan 34.1 m 29.0 m
Height 11.8 m 7.3 m
Length 37.6 m 30.3 m
Maximum speed 871 km/h 950 km/h
Operational range 5,930 km 11,100 km
Service ceiling 12,000 m 15,545 m
Max. takeoff weight 78,000 kg 45,132 kg
Empty weight 42,600 kg 22,566 kg
Total thrust 2 x 11,340 kgf 2 x 6,690 kgf
Performance Radar Chart
Change comparison vs

Frequently Asked Questions

Which is faster, the Airbus A321 or BD-700 Global Express?
The BD-700 Global Express is faster with a maximum speed of 950 km/h compared to the Airbus A321's 871 km/h, a difference of 79 km/h.
Which has longer range, the Airbus A321 or BD-700 Global Express?
The BD-700 Global Express has a longer range at 11,100 km compared to the Airbus A321's 5,930 km.
Which can fly higher, the Airbus A321 or BD-700 Global Express?
The BD-700 Global Express has a higher service ceiling at 15,545 meters (51,000 ft) compared to the Airbus A321's 12,000 meters (39,370 ft).
Which is heavier, the Airbus A321 or BD-700 Global Express?
The Airbus A321 has a higher maximum takeoff weight at 78,000 kg compared to the BD-700 Global Express's 45,132 kg.
Which is larger, the Airbus A321 or BD-700 Global Express?
The Airbus A321 is longer at 37.6 meters compared to the BD-700 Global Express's 30.3 meters.
Which is more expensive, the Airbus A321 or BD-700 Global Express?
The Airbus A321 is more expensive at approximately $120 million per unit compared to the BD-700 Global Express at $25 million.
Which entered service first, the Airbus A321 or BD-700 Global Express?
The Airbus A321 entered service first in 1994, 5 years before the BD-700 Global Express which entered service in 1999.
Which has been built in greater numbers, the Airbus A321 or BD-700 Global Express?
The Airbus A321 has been produced in greater numbers with 2,917 units compared to 816 units of the BD-700 Global Express.