South Korea Completes KF-21 Boramae Development After 1,600 Accident-Free Test Flights
South Korea's Defense Acquisition Program Administration declared the KF-21 Boramae fighter program complete at a ceremony in Sacheon on July 29, 2026, ten years and seven months after system development began, with the first production aircraft due in September.
South Korea formally closed out development of the KF-21 Boramae on July 29, 2026, with the Defense Acquisition Program Administration (DAPA) declaring the program complete at a ceremony held at Korea Aerospace Industries' headquarters in Sacheon, South Gyeongsang Province.
The milestone falls 10 years and seven months after system development began in December 2015. Six prototypes, two of them twin-seat airframes, flew more than 1,600 test sorties across 42 months without an accident. DAPA said the program had completed basic and detailed design, prototype manufacturing, ground testing and flight testing, together with the integrated logistics support and training systems that accompany the aircraft into service.
The fighter finished its flight test campaign in January 2026, two months ahead of schedule, and cleared its final combat suitability evaluation in May. Development cost is put at 8.8 trillion won, about $6.04 billion. Indonesia joined as a development partner, sharing costs in exchange for technology transfer and a prototype.
DAPA plans to hand the first production aircraft to the Republic of Korea Air Force in September 2026, after verification by both the manufacturer and the service. Forty aircraft are to be delivered by 2028, followed by 80 in an enhanced configuration by 2032, for a program total of 120.
That total is what makes the September handover a genuine turning point rather than a paperwork milestone. GlobalMilitary.net's inventory currently lists all 120 KF-21s as on order with none in service, and the aircraft has a concrete gap to fill: the Republic of Korea Air Force still flies 48 F-5E Tiger IIs, a 1970s-vintage light fighter. Alongside them sit 40 F-35As with 20 more on order, 59 F-15Ks and 167 F-16C/Ds, in a fleet of roughly 1,540 aircraft.
The KF-21 is positioned between those tiers — a 4.5-generation fighter with provision for later capability growth rather than a stealth aircraft, which is why South Korea continues to buy the F-35 in parallel. South Korea ranks sixth in the global military power ranking, and domestic production of a supersonic fighter puts it in a small group of nations able to design and build combat aircraft without foreign prime contractors.
Attention now turns to the enhanced Block II configuration due from 2032 and to export prospects, which South Korean officials have repeatedly identified as a program goal. Neither depends on the development declaration itself, but both rest on the ROKAF proving the aircraft in squadron service from September onward.
More News
All news →
F-35B Completes First Meteor Missile Release From Its Internal Weapons Bay
An F-35B flown by a Royal Navy test pilot jettisoned an inert MBDA Meteor from its internal weapons bay at Naval Air Station Patuxent River, Maryland, on October 7, the F-35 Joint Program Office and MBDA said on November 5, the first of a series of trials ahead of live firings.
US Army's HADES Spy Jet Flies for the First Time, a Global 6500 Replacing Turboprop ISR
The US Army said on October 30 that HADES Prototype 1, an airborne intelligence aircraft built on a modified Bombardier Global 6500 business jet, made its first flight on September 11, moving the program into mission system integration and developmental flight testing.
Hanwha Philly Shipyard Selected to Build Its First US Navy Ship, a $269 Million Medium Landing Ship
Hanwha Defense USA said on Oct. 29 that TOTE Services had chosen its Philly Shipyard to build one Medium Landing Ship for the US Navy and Marine Corps under TOTE's $2.2 billion construction-management contract, with options for three more vessels.
UK to Require Overseas Defense Suppliers to Invest Up to 100% of Contract Value in Britain From April 2027
The UK will require overseas firms winning defense contracts of £50 million or more to invest up to the full contract value in British jobs, factories and technology from April 2027, under an offset policy announced on 30 October 2026 that will not normally cover government-to-government deals.
Switzerland Shortlists Barak MX and SAMP/T NG for Second Long-Range Air Defense System, Keeps Patriot
The Federal Council on October 28 tasked the DDPS with continuing the evaluation of Israel's Barak MX and France's SAMP/T NG as a second long-range ground-based air defense system, to be fielded alongside a Patriot acquisition Bern says it will maintain despite delivery delays.
US Navy Has No Frigates in Service While 50 Other Navies Field 407 as Washington Weighs Foreign Designs
GlobalMilitary.net data shows the US Navy with no frigates in commission against 407 in 50 other fleets, as a White House-ordered plan for new surface combatants falls due in mid-November and foreign designs are offered.