GlobalMilitary.net Open-source military intelligence Updated daily

MiG-21 Fishbed vs Mirage 4000

MiG-21 Fishbed vs Mirage 4000 at a glance — top speed 2,125 vs 2,445 km/h, range 660 vs 2,000 km, max takeoff weight 8,625 vs 32,000 kg, built 11,496 vs 1 units.

Mikoyan-Gurevich MiG-21 Fishbed combat aircraft side profile drawing
Dassault Mirage 4000 combat aircraft side profile drawing
🇫🇷 Mirage 4000
Specifications
MiG-21 Fishbed Mirage 4000
Origin country 🇷🇺 Ex-USSR 🇫🇷 France
Category Combat Aircraft Combat Aircraft
Manufacturer Mikoyan-Gurevich Dassault
First flight 16 June 1955 9 March 1979
Year introduced 1958 --
Number produced 11496 units 1 units
Average unit price $2 million $35 million
Wing area 23.0 m² 72.7 m²
Wingspan 7.2 m 11.9 m
Height 4.1 m 6.0 m
Length 13.5 m 18.7 m
Maximum speed 2125 km/h 2445 km/h
Operational range 660 km 2,000 km
Service ceiling 19,000 m 20,000 m
Max. takeoff weight 8,625 kg 32,000 kg
Empty weight 4,871 kg 13,490 kg
Total thrust 1 x 4,689 kgf 2 x 11,100 kgf
Performance Radar Chart
Change comparison vs

Frequently Asked Questions

Which is faster, the MiG-21 Fishbed or Mirage 4000?
The Mirage 4000 is faster with a maximum speed of 2,445 km/h compared to the MiG-21 Fishbed's 2,125 km/h, a difference of 320 km/h.
Which has longer range, the MiG-21 Fishbed or Mirage 4000?
The Mirage 4000 has a longer range at 2,000 km compared to the MiG-21 Fishbed's 660 km.
Which can fly higher, the MiG-21 Fishbed or Mirage 4000?
The Mirage 4000 has a higher service ceiling at 20,000 meters (65,616 ft) compared to the MiG-21 Fishbed's 19,000 meters (62,335 ft).
Which is heavier, the MiG-21 Fishbed or Mirage 4000?
The Mirage 4000 has a higher maximum takeoff weight at 32,000 kg compared to the MiG-21 Fishbed's 8,625 kg.
Which is larger, the MiG-21 Fishbed or Mirage 4000?
The Mirage 4000 is longer at 18.7 meters compared to the MiG-21 Fishbed's 13.5 meters.
Which is more expensive, the MiG-21 Fishbed or Mirage 4000?
The Mirage 4000 is more expensive at approximately $35 million per unit compared to the MiG-21 Fishbed at $2.0 million.
Which has been built in greater numbers, the MiG-21 Fishbed or Mirage 4000?
The MiG-21 Fishbed has been produced in greater numbers with 11,496 units compared to 1 units of the Mirage 4000.