Calidus B250 vs F-35 Lightning II
Calidus B250 vs F-35 Lightning II at a glance — top speed 557 vs 1,960 km/h, range 2,400 vs 2,800 km, built 2 vs 965 units.
Specifications
|
Calidus B250 |
F-35 Lightning II |
| Origin country |
🇹🇷 Turkey |
🇺🇸 United States |
| Category |
Combat Aircraft |
Combat Aircraft |
| Manufacturer |
Calidus |
Lockheed Martin |
| First flight |
1 July 2017 |
15 December 2006 |
| Year introduced |
2018 |
2013 |
| Number produced |
2 units |
965 units |
| Average unit price |
$25 million |
$85 million |
| Wing area |
-- m² |
43.0 m² |
| Wingspan |
12.1 m |
11.0 m |
| Height |
-- m |
4.4 m |
| Length |
-- m |
15.6 m |
| Maximum speed |
557 km/h |
1960 km/h |
| Operational range |
2,400 km |
2,800 km |
| Service ceiling |
9,000 m |
15,000 m |
| Max. takeoff weight |
-- kg |
27,216 kg |
| Empty weight |
-- kg |
14,651 kg |
| Total thrust |
1 x 1,193 kW
|
1 x 19,500 kgf
|
Detailed Comparison
Loading analysis...
Generating comparison analysis...
Unable to generate comparison at this time.
Change comparison
vs
Which is faster, the Calidus B250 or F-35 Lightning II?
The F-35 Lightning II is faster with a maximum speed of 1,960 km/h compared to the Calidus B250's 557 km/h, a difference of 1,403 km/h.
Which has longer range, the Calidus B250 or F-35 Lightning II?
The F-35 Lightning II has a longer range at 2,800 km compared to the Calidus B250's 2,400 km.
Which can fly higher, the Calidus B250 or F-35 Lightning II?
The F-35 Lightning II has a higher service ceiling at 15,000 meters (49,212 ft) compared to the Calidus B250's 9,000 meters (29,527 ft).
Which is heavier, the Calidus B250 or F-35 Lightning II?
The F-35 Lightning II has a higher maximum takeoff weight at 27,216 kg compared to the Calidus B250's 0 kg.
Which is larger, the Calidus B250 or F-35 Lightning II?
The F-35 Lightning II is longer at 15.6 meters compared to the Calidus B250's 0.0 meters.
Which is more expensive, the Calidus B250 or F-35 Lightning II?
The F-35 Lightning II is more expensive at approximately $85 million per unit compared to the Calidus B250 at $25 million.
Which entered service first, the Calidus B250 or F-35 Lightning II?
The F-35 Lightning II entered service first in 2013, 5 years before the Calidus B250 which entered service in 2018.
Which has been built in greater numbers, the Calidus B250 or F-35 Lightning II?
The F-35 Lightning II has been produced in greater numbers with 965 units compared to 2 units of the Calidus B250.