GlobalMilitary.net Open-source military intelligence Updated daily

MQ-4 Triton vs Shahed 136

MQ-4 Triton vs Shahed 136 at a glance — top speed 610 vs 185 km/h, range 15,200 vs 2,500 km, max takeoff weight 14,628 vs 200 kg, built 30 vs 26,000 units.

Northrop Grumman MQ-4 Triton military drones side profile drawing
🇺🇸 MQ-4 Triton
HESA Shahed 136 military drones side profile drawing
🇮🇷 Shahed 136
Specifications
MQ-4 Triton Shahed 136
Origin country 🇺🇸 United States 🇮🇷 Iran
Category Military Drones Military Drones
Manufacturer Northrop Grumman HESA
First flight 22 May 2013 1 January 2021
Year introduced 2018 2021
Number produced 30 units 26000 units
Average unit price $180 million $193K
Wingspan 39.9 m 2.5 m
Length 14.5 m 3.5 m
Maximum speed 610 km/h 185 km/h
Operational range 15,200 km 2,500 km
Service ceiling 16,800 m 4,000 m
Max. takeoff weight 14,628 kg 200 kg
Empty weight 6,781 kg -- kg
Total thrust -- 1 x 37 kW
Performance Radar Chart
Change comparison vs

Frequently Asked Questions

Which is faster, the MQ-4 Triton or Shahed 136?
The MQ-4 Triton is faster with a maximum speed of 610 km/h compared to the Shahed 136's 185 km/h, a difference of 425 km/h.
Which has longer range, the MQ-4 Triton or Shahed 136?
The MQ-4 Triton has a longer range at 15,200 km compared to the Shahed 136's 2,500 km.
Which can fly higher, the MQ-4 Triton or Shahed 136?
The MQ-4 Triton has a higher service ceiling at 16,800 meters (55,118 ft) compared to the Shahed 136's 4,000 meters (13,123 ft).
Which is heavier, the MQ-4 Triton or Shahed 136?
The MQ-4 Triton has a higher maximum takeoff weight at 14,628 kg compared to the Shahed 136's 200 kg.
Which is larger, the MQ-4 Triton or Shahed 136?
The MQ-4 Triton is longer at 14.5 meters compared to the Shahed 136's 3.5 meters.
Which is more expensive, the MQ-4 Triton or Shahed 136?
The MQ-4 Triton is more expensive at approximately $180 million per unit compared to the Shahed 136 at $0.2 million.
Which entered service first, the MQ-4 Triton or Shahed 136?
The MQ-4 Triton entered service first in 2018, 3 years before the Shahed 136 which entered service in 2021.
Which has been built in greater numbers, the MQ-4 Triton or Shahed 136?
The Shahed 136 has been produced in greater numbers with 26,000 units compared to 30 units of the MQ-4 Triton.